Username
Password
Slide background
Slide background
Slide background
Slide background
Slide background
Slide background
Slide background

The saying goes first of all DESERVE THEN DESIRE

This technically matches with Power Products Group of Engineering efficiency to provide superb quality service and have full range to re-build the main engine.


Crank Shaft grinding up to 6.5 meters.
Crank Shaft rebuilding by submerged arc welding up to 5.7 meters.
Liner boring and honing.

We normally repair all parts except broken crankshaft.

Piston Crown
• Cylinder Cover
• Re-Babbiting
• Piston Rods
• Exhaust valve spindle & seat
• Connecting Rods
• Crank Shaft rebuilding and grinding to STD Size