This technically matches with Power
Products Group of Engineering efficiency to provide superb quality
service and have full range to re-build the main engine.
Crank Shaft grinding up to
6.5 meters.
Crank Shaft rebuilding by submerged arc welding up to 5.7 meters.
Liner boring and honing.